
May 2019 - Space Woking - MC Blenheim House Construction Just shy of 300 square metres of EasyDeck Composite decking has been installed onto the 7th floor of this impressive office building in Woking with its stunning views reaching into Canary Wharf. The deck area made for a challenging installation project with the buildings curved facade in accommodating the fall as well as the design requirements but our experienced installation team rose to the challenge and the project has been completed to the clients complete satisfaction and on time. EasyDeck is arguably the only composite decking system that can cater to the needs of such a project. Designed from the bottom up, the system and its more grown up range, Megawood, include a complete sub-structure system that includes FixStep, a unique solution for fitting onto a flat roof that eliminates any risk of damage to the membrane in transferring loads and water run-off across the roof. The systems design and manufacture ensures a long and trouble free life - vital when you are 7 storeys up!